See How We Deliver Fast, Affordable Prefab Solutions Across Industries

Over 5 years of perfecting compliance, quality control & sourcing – so you get a faster, more reliable prefab solution.

We handle everything – design, certification, materials, and quality – so your project is delivered stress-free.

From delivery to occupancy certificate
in 21 days - see our fastest build yet!

ADDISON ST – GOULBURN NSW

FLOOR SIZE: 124m2
ASPECTS: 3 bedroom, 2 bathrooms, Lock up
garage
ASSEMBLY TIME: 21 DAYS!
BASIX, Fire Rating, Design Cert – 100% certified-
26 times faster than traditional build!
(21 days vs 18+ months)
DELIVERY TIME: 12 weeks from final design to delivery onsite

Goulburn Walk Through

HOUSE ONE – CASULA

FLOOR SIZE: 124sqm
ASPECTS: 3 bedroom | 2.5 bathrooms | Lock up garage
ASSEMBLY TIME: 6 weeks
30% Cheaper project (end to end)
42% faster assembly than traditional build
DELIVERY TIME: 13 weeks from final design to delivery onsite

HOUSE TWO – CASULA

FLOOR SIZE: 124sqm
ASPECTS: 3 bedroom | 2.5 bathrooms | Lock up garage
ASSEMBLY TIME: 6 weeks
30% Cheaper project (end to end)
42% faster assembly than traditional build
DELIVERY TIME: 13 weeks from final design to delivery onsite

HOUSE THREE – CASULA

FLOOR SIZE: 124sqm
ASPECTS: 3 bedroom | 2.5 bathrooms | Lock up garage
ASSEMBLY TIME: 6 weeks
30% Cheaper project (end to end)
42% faster assembly than traditional build
DELIVERY TIME: 13 weeks from final design to delivery onsite